if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

Find the slope of the line. y 8 (10, 6) 6 4 2 (4, 1.2) 4 6 8 10 x slope =
Which statement accurately describes the relationship between cash crops and enslaved workers? Cash crops provided many enslaved workers with money to purchase
how modern periodic table overcome the mendeleev periodic table​
a boulder with a mass of about 1.5 x 10^5 kg falls and strikes the ground at 70 m/s how much kinetic energy dies the boulder deliver to the ground PLEASE HELP N
mention any two scopes of population education​
OxYgen and hydrogen particles are kept in a container. Which of the following accurately describes diffüsion of these gases? OOxygen and hydrogen particles conc
plz help sentence of phrase and clause​
Question 15 of 25 What is the standard cell notation of a galvanic cell made with aluminum and magnesium? A. Al3+(aq) | Al(s) || Mg(s) | Mg2+(aq) B. Mg2+(aq) |
Primary Source Document Analysis - Part 1 Directions: Read the document below and answer the analysis questions that follow Lot The Accommodation Act by the Lou
___ describes how much energy an earthquake releases ​