reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

what is 500 10 times much as
What is 10.6 as a fraction
when i double my number and add eight i get my number plus twelve whats mynumber
What is the Persians major holidays
What is the number in Word form 43080700
what are two examples of the impact the Americas had on Europe during the Columbian Exchange
ALGEBRA 30. The difference of three times a number and 4 is -19 32. The sum of twice a number and half the number is 10. 34. Four times the difference of a numb
Which information about the earth would not be represented when a globe is used as a model? Choose all answers that are correct. a. how the earth changes over
tomas grandfather is 100 years old.tomas grandfather is 10 times as old as tomas .how los is tomas?
between which two integers could you find euler's number?